One project, every tool

Lone Star 48, Hall 2: one late change, followed from the model to the field.

One project, every tool follows a single late change through Hall 2, from the model to the field.

  • Thirty-six cooling branches go from DN 150 to DN 200, and each tool takes its turn.
  1. Hall 2
  2. QA/QC Agent
  3. Clash Detection
  4. Modular Configurator
  5. Matechi Factory
  6. Pod Traveler
  7. Field Evidence
  8. Data Center Delivery Lab
Lone Star 48 · Hall 2

One building. One late change.

Lone Star 48, Hall 2: our own worked data-center project, not a client's.

In room 202, the CDU gallery, thirty-six branches went from DN 150 to DN 200 late in design.

We followed that one change through every Matechi tool.

01 · QA/QC Agent

The agent reads the spec, here six rules, and checks the whole building: 3,271 elements in 7.1 seconds.

FAIL: 110 critical findings, each cited and shown in the model.

A fix is previewed, not applied; a person approves.

Rev 1, the same six rules: PASS. 3,343 elements, no critical findings.

Open the QA/QC Agent page ↗
02 · Clash Detection

The bigger risers hit the power tray by 9.5 mm, 18 times.

Matechi's clash engine on the web and Revit's own Interference Check agree, and the agent suggests moving the tray.

Rev 1 moves the tray 50 mm east: 40 mm clear, against the spec's 10 mm.

Open the Clash Detection page ↗
03 · Modular Configurator

The gallery comes apart into what gets built off site: racks, spools and CDU skids.

Every module declares its ports, and they have to connect in the model before anything is built.

The rev 0 skid won't mate at DN 150. The rev 1 skid does, and the bill of materials updates.

Open the Modular Configurator page ↗
04 · Matechi Factory

The fabricator lays out the shop from an empty shell: cutting, fit-up, welding, testing, the dock.

When the pipe gets bigger, the robotic weld cells change with it.

Intake, then the work, then a checked layout of the floor.

Open the Matechi Factory page ↗
05 · Pod Traveler

Thursday: the shop is still welding rev 0.

The model comparison finds the 36 spools that changed, and a person reissues them at rev 1.

Every traveler shows rev 1 before the first weld.

Open the Pod Traveler page ↗
06 · Field Evidence

On site, a technician walks the gallery with a phone.

Every photo goes back to the model from the phone's own position: 36 photos, registered within 9.8 mm.

One valve doesn't match, DN 150 from old stock. Swapped, photographed again, closed.

Open the Field Evidence page ↗
07 · Data Center Delivery Lab

Hall 2 is the worked project in our course: the building first, then the campus.

One change, followed end to end. The agents read, checked and proved; people made every decision.

Open the Data Center Delivery Lab page ↗

The whole story, as a film.

The same project as one continuous film and scroll, with the engineer's and the architect's narration.

Tell us one workflow, and we'll show you an agent that does it.

A 30-minute call on your own inputs, or tell us about the project first.