MATECHI
Production planning

Test line changes before moving equipment.

Inspect recognizable station equipment, footprints and material-flow routes in 3D or plan. Compare production scenarios while keeping cycle times, shifts, product mix and other operating assumptions visible.

Test line changes before moving equipment.

Equipment and layout in context

Select a station to inspect labeled equipment, upstream and downstream relationships, route crossings and footprint overlaps. A readable orthographic plan complements the 3D view.

Inspect a rejected handoff

The synthetic lifecycle workbench keeps acknowledgement separate from completion. Reject a packet, revise the source and BOM, review the new revision, resubmit, and compare the returned fixture output. Browser-local state and portable exports support inspection; no MES connection, live machine write or factory completion is claimed.

Explicit operating assumptions

Scenario results depend on the supplied cycle times, shifts, buffers and variability. The public factory is a synthetic study, not a vendor-certified model, live telemetry feed or safety-approved facility. Animated flow does not establish production capacity.