Test line changes before moving equipment.
Inspect recognizable station equipment, footprints and material-flow routes in 3D or plan. Compare production scenarios while keeping cycle times, shifts, product mix and other operating assumptions visible.

Equipment and layout in context
Select a station to inspect labeled equipment, upstream and downstream relationships, route crossings and footprint overlaps. A readable orthographic plan complements the 3D view.
Inspect a rejected handoff
The synthetic lifecycle workbench keeps acknowledgement separate from completion. Reject a packet, revise the source and BOM, review the new revision, resubmit, and compare the returned fixture output. Browser-local state and portable exports support inspection; no MES connection, live machine write or factory completion is claimed.
Explicit operating assumptions
Scenario results depend on the supplied cycle times, shifts, buffers and variability. The public factory is a synthetic study, not a vendor-certified model, live telemetry feed or safety-approved facility. Animated flow does not establish production capacity.