Glossary
Glossary
Plain meanings of the words used in BIM, modular and data center construction, in one sentence each.
Updated 19 November 2026
Clash
Two elements in a building model that take up the same space, or sit closer than they are allowed to. Found by clash detection in Revit, Navisworks or Autodesk Construction Cloud.
Clash resolution
Deciding which element moves, by how much and who changes it, then checking the next model is clear. The step after detection, and where coordination time goes.
BIM
Building information modeling: a 3D model of a building where every element carries data, not just geometry. Revit is the most common BIM tool for design.
LOD
Level of development: how complete and reliable a model element is, from a rough placeholder to what was actually installed. Contracts say which LOD each stage must reach.
IFC
Industry Foundation Classes: an open file format for building models, so different tools can share them. Solibri and many checkers work on IFC.
IDS
Information Delivery Specification: a buildingSMART format for writing down, in a machine-readable way, which information a model must contain. A model can then be checked against it automatically.
QA/QC (BIM)
Quality assurance and quality control for models: checking a model against standards and the project spec before it is issued.
Model checking
Testing a building model against rules (naming, data, sizes, materials, the spec) to find errors before drawings go out.
As-built
A record of what was actually built, as opposed to what was designed. Checking the as-built against the model catches what changed on site.
Scan to BIM
Turning a laser scan or photo survey of a building into a building model. Used for renovations and as-built records.
Reality capture
Measuring what is on site with laser scanners, phone photos or video, to compare it with the model.
DfMA
Design for manufacture and assembly: designing a building so its parts can be made in a factory and put together quickly on site.
Modular construction
Building in factory-made modules or skids that are shipped and set in place on site.
Fixed-position layout
A factory floor where the product stays put and people, tools and materials come to it, as in building large modules.
Commissioning
The stepped testing that proves a building's systems work, from factory tests to all systems running together.
IST
Integrated systems testing: the final commissioning level, where every system runs together and failures are staged on purpose.
Hyperscaler
A large cloud service provider that runs hyperscale data centers. IBM notes the word is also used for the data centers themselves.
Colocation
A data center whose owner rents space, power and cooling to tenants who bring and keep their own servers. Also called colo.
Liquid cooling
Cooling racks with liquid brought to them, instead of only with air. More pipework to size, coordinate and test.
Cell hall
In a data center, the hall where the racks of computing equipment stand: the white space.
Sources for hyperscaler, colocation and neocloud: IBM, What is a hyperscale data center?; Equinix, What is colocation?; Micron, What is a neocloud?.